Saturday, 5 Oct 2024

Road closure in Tampines on March 29 for construction of overhead bridge for new HDB blocks

SINGAPORE – A section of Tampines Avenue 6 and Tampines Avenue 11 will be temporarily closed to traffic next Friday (March 29) for the construction of a new overhead bridge.

The closure, which will be from 1am to 5am, will affect the stretch from the junction of Tampines Avenue 6 and Tampines Street 61 to the junction of Tampines Avenue 11 and Tampines North Drive 1.

The Housing and Development Board (HDB) said in a statement on Friday that the new pedestrian overhead bridge will serve future residents of housing developments Tampines Greenview and Tampines Greenweave.

The bridge is expected to be completed by 2019.

With the temporary road closure, motorists heading from Tampines Avenue 11 to Tampines Avenue 6 are advised to use an alternative route from Tampines North Drive 1 to Tampines Street 61, HDB said.

Those travelling from Tampines Avenue 6 to Tampines Avenue 11 should take the route from Tampines Street 61 to Tampines North Drive 1 instead.

There will be barricades and diversion signs to guide motorists.

HDB also encouraged motorists to drive carefully and observe the information signs.

Source: Read Full Article

Related Posts